
PPO NORYL™ GFN30F-701S SABIC INNOVATIVE SHANGHAI
425
- Unit Price:US$ 4,950 /MT
- Packaging Specification:25 KG/PKG
- Packaging Material:Paper bag
- Supply Quantity:25MT
- Delivery Terms:FOB
- Port of Loading :Shanghai port, China
- Accepted Payment Methods:T/T
- Shipping:Negotiate supplier for shipping details
Supplier Information
ASIA PLASTIC EXCHANGE LIMITED
+86 755 ********View
serv********View
+86 ********View
For more details, please contact the supplier!
Material Description
- Material Properties:Dimensional stability|Low warpage|Low Specific Gravity
- Application Areas:Faucet|Shower|Water meter component|Water pump impeller|Water treatment equipment|Water filter
- Color:--
- Grade:Injection grade
Technical Data Sheet
| impact performance | Test Condition | Test Method | Test Result | Test Unit |
|---|---|---|---|---|
| Suspended wall beam without notch impact strength | 23°C | ISO 180/1U | 32 | kJ/m² |
| -30°C | ISO 180/1U | 36 | kJ/m² | |
| Impact strength of cantilever beam gap | 23°C | ISO 180/1A | 12 | kJ/m² |
| -30°C | ISO 180/1A | 12 | kJ/m² | |
| Impact strength of simply supported beam without notch | 23°C | ISO 179/1eU | 39 | kJ/m² |
| -30°C | ISO 179/1eU | 47 | kJ/m² | |
| flammability | Test Condition | Test Method | Test Result | Test Unit |
| UL flame retardant rating | 1.5mm | UL 94 | HB | |
| Extreme Oxygen Index | ASTM D2863 | 26 | % | |
| mechanical properties | Test Condition | Test Method | Test Result | Test Unit |
| bending strength | Yield,100mmSpan5 | ASTM D790 | 162 | Mpa |
| Yield,50.0mmSpan4 | ASTM D790 | 180 | Mpa | |
| ISO 178 | 183 | Mpa | ||
| Bending modulus | ISO 178 | 8710 | Mpa | |
| 100mmSpan5 | ASTM D790 | 7170 | Mpa | |
| 50.0mmSpan4 | ASTM D790 | 8000 | Mpa | |
| Tensile strain | Break | ISO 527-2 | 1.8 | % |
| elongation | Break | ASTM D638 | 2.0 | % |
| Tensile modulus | ASTM D638 | 9150 | Mpa | |
| ISO 527-2/1 | 8740 | Mpa | ||
| tensile strength | Break | ASTM D638 | 116 | Mpa |
| Break | ISO 527-2 | 117 | Mpa | |
| thermal performance | Test Condition | Test Method | Test Result | Test Unit |
| RTI Str | UL 746 | 90.0 | °C | |
| RTI Imp | UL 746 | 90.0 | °C | |
| RTI Elec | UL 746 | 90.0 | °C | |
| Hot deformation temperature | 1.8MPa,Unannealed,64.0mmSpan | ISO 75-2/Af | 137 | °C |
| Vicat softening temperature | -- | ISO 306/B50 | 143 | °C |
| -- | ISO 306/B120 | 147 | °C | |
| Linear coefficient of thermal expansion | MD:-40to40°C | ASTME831 | 3.1E-05 | cm/cm/°C |
| TD:-40to40°C | ASTME831 | 6.2E-05 | cm/cm/°C | |
| Hot deformation temperature | 0.45MPa,Unannealed,3.20mm | ASTM D648 | 142 | °C |
| 0.45MPa,Unannealed,6.40mm | ASTM D648 | 158 | °C | |
| 0.45MPa,Unannealed,64.0mmSpan | ISO 75-2/Bf | 143 | °C | |
| 1.8MPa,Unannealed,3.20mm | ASTM D648 | 137 | °C | |
| 1.8MPa,Unannealed,6.40mm | ASTM D648 | 138 | °C | |
| Physical properties | Test Condition | Test Method | Test Result | Test Unit |
| melt mass-flow rate | 300°C/5.0kg | ASTM D1238 | 8.7 | g/10min |
| Melt Volume Flow Rate (MVR) | 300°C/5.0kg | ISO 1133 | 7.82 | cm3/10min |
| Shrinkage rate | MD:3.20mm | Internal Method | 0.10-0.40 | % |
| Water absorption rate | 24hr | ASTM D570 | 0.060 | % |
| Electrical performance | Test Condition | Test Method | Test Result | Test Unit |
| Compared to the anti leakage trace index | CTI | UL 746 | PLC 4 | |
| Arc resistance | ASTM D495 | PLC7 | ||
| Dissipation factor | 60Hz | ASTM D150 | 9E-04 | |
| 50Hz | ASTM D150 | 9E-04 | ||
| Dielectric constant | 60Hz | ASTM D150 | 2.93 | |
| 50Hz | ASTM D150 | 2.93 | ||
| Dielectric strength | 3.20mm,inOil | ASTM D149 | 22 | KV/mm |
| High arc combustion index | HAI | UL 746 | PLC 4 | |
| High voltage arc tracing rate | HVTR | UL 746 | PLC 3 | |
| Hot wire ignition | HWI | UL 746 | PLC 4 | |
| hardness | Test Condition | Test Method | Test Result | Test Unit |
| Rockwell hardness | L-Sale | ASTM D785 | 108 |
IMPORTANT NOTES: Plas.com collected the data in the data sheet from the material manufacturers. Plas.com makes the best effort to improve the accuracy of the data, but has no responsibility for the data. We strongly recommend verifying the validity of the data with the material manufacturers before making a final decision.