
PPO NORYL™ FM3020VE-BK1066 SABIC INNOVATIVE JAPAN
225
- Unit Price:US$ 4,627 /MT
- Packaging Specification:25 KG/PKG
- Packaging Material:Paper bag
- Supply Quantity:10MT
- Delivery Terms:FOB
- Port of Loading :China Main Port
- Accepted Payment Methods:T/T
- Shipping:Negotiate supplier for shipping details
Supplier Information
ASIA PLASTIC EXCHANGE LIMITED
+86 755 ********View
serv********View
For more details, please contact the supplier!
Material Description
- Material Properties:Glass fiber reinforced|Thermal stability| Structural foaming|fibre|Dimensional stability
- Application Areas:medical care
- Color:--
- Grade:Injection grade
Technical Data Sheet
Basic Performance | Test Condition | Test Method | Test Result |
---|---|---|---|
Water absorption rate | 24hrs | ASTM D-570 | 0.08 % |
mechanical properties | Test Condition | Test Method | Test Result |
---|---|---|---|
Bending modulus | 6.4mm | ASTM D-790 | 6546 Mpa |
tensile strength | 屈伏点3.2mm | ASTM D-638 | 72 Mpa |
Rockwell hardness | ASTM D-785 | 83 | |
bending strength | 6.4mm | ASTM D-790 | 105 Mpa |
Impact strength of cantilever beam gap | 23°C | ASTM D-256 | 53 J/m |
thermal performance | Test Condition | Test Method | Test Result |
---|---|---|---|
Linear coefficient of thermal expansion | ASTM E-831 | 2.3×10 1/°C | |
Hot deformation temperature | 0.45MPa | ASTM D-648 | 118 °C |
1.8MPa | ASTM D-648 | 110 °C | |
Long term use temperature | 无冲击 | UL 746B | 50 °C |
含冲击 | UL 746B | 50 °C | |
电气 | UL 746B | 50 °C |
Physical properties | Test Condition | Test Method | Test Result |
---|---|---|---|
enhance | 30 % |
Electrical performance | Test Condition | Test Method | Test Result |
---|---|---|---|
Surface resistivity | ASTM D-257 | 1.0×10 Ω.cm | |
Volume resistivity | ASTM D-257 | 1.0×10 Ω.cm |
IMPORTANT NOTES: Plas.com collected the data in the data sheet from the material manufacturers. Plas.com makes the best effort to improve the accuracy of the data, but has no responsibility for the data. We strongly recommend verifying the validity of the data with the material manufacturers before making a final decision.