Technical Data Sheet
physical property | Test Condition | Test Method | Test Result |
---|
Shrinkage rate | | ASTM D955 | 0.20to0.40 % |
density | | ASTM D792 | 1.53 g/cm³ |
melt mass-flow rate | | ASTM D1238 | 9.0 g/10min |
Shrinkage rate | | ASTM D955 | 0.50to0.70 % |
Water absorption rate | | ASTM D570 | 0.10 % |
Mechanical properties | Test Condition | Test Method | Test Result |
---|
compressive strength | | ASTM D695 | 139 MPa |
shear strength | | ASTM D732 | 84.8 MPa |
Tensile modulus | | ASTM D638 | 10600 MPa |
tensile strength | | ASTM D638 | 168 MPa |
elongation | Break | ASTM D638 | 2.3 % |
Flexural modulus | | ASTM D790 | 9900 MPa |
bending strength | | ASTM D790 | 239 MPa |
Impact resistance | Test Condition | Test Method | Test Result |
---|
Impact strength of cantilever beam gap | | ASTM D256 | 69 J/m |
Suspended wall beam without notch impact strength | | ASTM D256 | 960 J/m |
Filling analysis | Test Condition | Test Method | Test Result |
---|
melt viscosity | | ASTM D3835 | 60.0 Pa·s |
Electrical performance | Test Condition | Test Method | Test Result |
---|
Surface Resistivity | | ASTM D257 | >1.9E+17 ohms |
Volume resistivity | | ASTM D257 | 1.8E+17 ohms·cm |
dielectric strength | | ASTM D149 | 18 kV/mm |
dielectric constant | | ASTM D150 | 3.74 |
dielectric constant | | ASTM D150 | 3.69 |
Dissipation Factor | | ASTM D150 | 2E-03 |
Dissipation Factor | | ASTM D150 | 6E-03 |
Thermal performance | Test Condition | Test Method | Test Result |
---|
thermal conductivity | | ASTME1530 | 0.29 W/m/K |
Heat distortion temperature | | ASTM D648 | 257 °C |
Glass Transition Temperature | | DSC | 158 °C |
melting temperature | | ASTM D3418 | 340 °C |
specific heat | | DSC | 1300 J/kg/°C |
specific heat | | DSC | 1700 J/kg/°C |
IMPORTANT NOTES: Plas.com collected the data in the data sheet from the material manufacturers. Plas.com makes the best effort to improve the accuracy of the data, but has no responsibility for the data. We strongly recommend verifying the validity of the data with the material manufacturers before making a final decision.