plas

POM TENAC™-C  LZ750 BK ASAHI JAPAN

217
  • Unit Price:US$ 3,246 /MT
  • Packaging Specification:
    25 KG/PKG
  • Packaging Material:
    Paper bag
  • Supply Quantity:
    15MT
  • Delivery Terms:
    FOB
  • Port of Loading :
    China Main Port
  • Accepted Payment Methods:
    T/T
  • Shipping:
    Negotiate supplier for shipping details

Supplier Information

ASIA PLASTIC EXCHANGE LIMITED

+86 755 ********View
serv********View
+86 ********View

For more details, please contact the supplier!

Material Description

  • Material Properties:Low friction coefficientHomopolymerwear resistantLubricityLow viscosityHigh mobility
  • Application Areas:Engine partsHousehold goodsEngineering accessoriesShellOutdoor applications
  • Color:--
  • Grade:Injection grade

Technical Data Sheet

flammabilityTest ConditionTest MethodTest Result
UL flame retardant rating0.75mmUL 94HB
mechanical propertiesTest ConditionTest MethodTest Result
bending strengthASTM D79091.0 Mpa
Bending modulus--ISO 1782700 Mpa
Bending modulus--ASTM D7902800 Mpa
elongationBreakISO 527-215 %
elongationBreakASTM D63820 %
tensile strength--ASTM D63860.0 Mpa
tensile strengthYieldISO 527-262.0 Mpa
Tensile modulusISO 527-22700 Mpa
thermal performanceTest ConditionTest MethodTest Result
Hot deformation temperature1.8MPa,UnannealedASTMD648100 °C
Hot deformation temperature0.45MPa,UnannealedASTMD648157 °C
Linear coefficient of thermal expansionMDASTMD6961E-04 cm/cm/°C
Physical propertiesTest ConditionTest MethodTest Result
Water absorption rate23°C,24hr,50%RHASTM D5700.20 %
Shrinkage rateMDInternal Method1.6-2.0 %
melt mass-flow rate190°C/2.16kgISO 113330 g/10min
hardnessTest ConditionTest MethodTest Result
Rockwell hardnessR-ScaleASTM D785117
Rockwell hardnessM-ScaleASTM D78586
IMPORTANT NOTES: Plas.com collected the data in the data sheet from the material manufacturers. Plas.com makes the best effort to improve the accuracy of the data, but has no responsibility for the data. We strongly recommend verifying the validity of the data with the material manufacturers before making a final decision.